Installing Multiple GEM120CT Meters (ID1 & ID2)

Installing Multiple GEM120CT Meters (ID1 & ID2)

Overview

Where both grid and external PV generation must be monitored, two GEM120CT meters can be installed:

  • ID1: Grid feed measurement

  • ID2: PV string measurement

Voltage Reference Bridging

Both meters share the same voltage reference for accuracy.

Connection

Meter

Terminal

Live Feed

ID1 ↔ ID2 (bridge)

4 (L)

Neutral Feed

ID1 ↔ ID2 (bridge)

3 (N)

CT Clamp Placement

Meter

CT Location

Arrow Direction

ID1

Main grid feed

Toward property load

ID2

PV string inverter live cable

Toward property load

CT clamps must never encircle both live and neutral cables.

Communication Wiring

Both meters can share a communication line back to the inverter.

Meter

RS485 +

RS485 –

ID1

Port 10 → Inverter A+

Port 9 → Inverter B–

ID2

Bridged to ID1

Bridged to ID1

Only ID1 communicates directly with the inverter.




    • Related Articles

    • GEM120CT Overview

      Every system will need at least 1 GEM120 (ID1) meter installing to monitor the import and export of the building. Every GEM120 meter needs a power supply/voltage reference point. This could be a dedicated supply from a 6A, for example. Every GEM120 ...
    • Difference Between ID1 and ID2 Meters

      Overview Meters can be assigned an ID number between 1 and 8, defining their role within the system. The ID1 meter is always the main grid meter, while ID2–ID8 are used for monitoring additional devices. Meter Roles ID Function Typical Use Case ID1 ...
    • Common Wiring Mistakes When Installing LoRa

      Overview Incorrect wiring can cause communication failures between the inverter and the meter. This guide outlines common mistakes and how to avoid them. Common Errors Mistake Description Corrective Action Using wires from two different pairs Mixing ...
    • Programming the GEM630MCT Meter from ID1 to ID2

      Overview Meters can be configured with IDs 1–8. ID 1 monitors the main grid; ID 2 monitors an external PV inverter or device. Steps to Change ID Press and hold ENTER until the password screen appears. Enter password 1000 using arrow buttons ▲ ▼ to ...
    • EM115/GEM120 Grid Meter Installation

      Arrow always points towards the load CT clamp cables must not be cut down or extended EM115/GEM120 meters come with a split core CT that has a 2m cable The communication cable for the GEM120 uses the same communication terminals as the EM115 ...

    GivBot