Equipment to be grounded, when installing, must first install a protective ground wire; When removing equipment, the protective ground wire must be removed last.

The grounding of the energy storage inverter meets the local requirements for the grounding of photovoltaic modules and energy storage inverters. To ensure continuous conduction with the ground in order to optimally protect the system and personnel.

The system must not be operated without being grounded
    • Related Articles

    • Troubleshooting and Support

      GivEnergy products undergo strict testing and inspection before delivery to ensure high performance and reliability. However, as with all electrical devices, issues may still occur. If you experience any problems or contact GivEnergy Customer Support ...
    • AC Utility Grid Connection

      Cable size requirements for the String Inverter are dependant on the model: HY 8.0 - minimum 4mm² - 6.7mm² HY 10.0 - minimum 2.5mm² - 8.4mm² The recommended maximum cable length should not exceed 50m as the resistance of the cable will consume ...
    • Connection Installation with Giv-Gateway

      Extra care and attention must be taken when installing and maintaining any GivEnergy equipment. The system is capable of retaining a high voltage, even when disconnected. All electrical installations must be carried out by a qualified and registered ...
    • Giv-Gateway Connection Guide

      All in One Installation with Giv-Gateway Extra care and attention must be taken when installing and maintaining any GivEnergy equipment. The system is capable of retaining a high voltage, even when disconnected. All electrical installations must be ...
    • Parellel Connection Guide

      Description The new parallel function will allow up to 3 x AIO 6kW (5kW AUS) inverter/battery units to be connected to the same gateway. Providing up to 18kW (15kW AUS) of power and 40.5kWh of storage in one single virtual system. This is all managed ...

    GivBot