Giv-Bat 9.5 (Gen 2) Manual

Giv-Bat 9.5 (Gen 2) Manual

Download Manual

This article summarises the Giv-Bat 9.5 (Gen 2) Manual, covering the Giv-Bat 9.5-G2 9.5 kWh LiFePO₄ battery. This Generation 2 model provides high capacity for larger home storage systems, supports parallel expansion, and integrates with GivEnergy Hybrid and AC-Coupled inverters. This guide covers installation details, DIP switch settings, LED indicators, and commissioning.

Safety Information

  • Install in a dry, ventilated location.
  • Do not expose to direct sunlight or extreme temperatures.
  • All electrical installation must be completed by a qualified electrician.

Installation Requirements

  • Mount using the supplied wall bracket or floor stand.
  • Allow required clearances for airflow and access.
  • Wire DC and CAN communication cables according to the inverter type.

LED Indicators

  • Green: Normal operation
  • Blue: Charging
  • Orange: Idle/standby
  • Red: Error condition

Commissioning

  1. Turn on the battery isolator.
  2. Power on the inverter.
  3. Verify inverter–battery communication.
  4. Check system behaviour in the portal/app.

Maintenance

  • Keep ventilation paths clear.
  • Inspect DC and communication wiring annually.
  • Update firmware via the inverter when available.

    • Related Articles

    • Giv-Bat 5.12 (Gen 3) Manual

      Download Manual This article summarises the Giv-Bat 5.12 (Gen 3) Manual, covering the Giv-Bat 5.12-G3 5.12 kWh LiFePO₄ battery module. This compact Generation 3 model features enhanced BMS capabilities, modular stacking support, and lightweight ...
    • Giv-Bat 9.5 (Gen 3) Manual

      Download Manual This article summarises the Giv-Bat 9.5 (Gen 3) Manual, covering the Giv-Bat 9.5-G3 9.5 kWh LiFePO₄ battery. This third-generation model features advanced BMS hardware, improved communication architecture, modular stacking capability, ...
    • Giv-Bat 2.6, 5.2 & 8.2 (Gen 1) Manual

      Download Manual This article summarises the key information from the Giv-Bat 2.6, 5.2, 8.2 (Gen 1) Manual, including installation guidance, system operation, LED behaviour, commissioning, and safety notes. Overview The GivEnergy Gen 1 Battery is a ...
    • Stackable Batteries Manual

      Download Manual This article summarises the Stackable Batteries Manual, which applies to the GivEnergy Stackable Battery System. This system consists of a base module with integrated electronics and stackable battery modules that can be added to ...
    • All in One 2 & Gateway 2 Manual

      Download Manual This article provides a complete installation, safety, configuration, and maintenance summary for the GivEnergy All in One 2 (AIO2), including the MPPT Unit, Gateway 2, and Expansion Battery. It condenses all key information from the ...

    GivBot