GEM630 Meter Manual

GEM630 Meter Manual

Download Manual

This manual summarises the installation requirements and wiring configuration for the GEM630 / SDM630MCT 3-Phase Meter. It is used to measure import/export power on three-phase GivEnergy systems.

System Overview

The GEM630 is a three-phase CT-based energy meter used to provide accurate grid import/export data to GivEnergy inverters. It is required on all three-phase systems for correct power flow control and export limiting.

Key Features

  • Supports 3-phase installations.
  • Uses split-core CT clamps (2 m cable each).
  • Provides real-time energy import/export measurement.
  • Communicates over RS485 using twisted pair.
  • Configurable as ID1 for grid metering.

Installation Requirements

  • Must be installed on the building’s main incoming supply to monitor all loads.
  • Requires a 230 V power supply and voltage reference.
  • Requires one twisted-pair RS485 communication cable back to inverter.
  • CT clamps must not be cut, extended, or modified.
  • Arrow on CT clamps must point towards the load.

Wiring Overview

The GEM630 connection pins are:

  • Pin 1: Neutral
  • Pin 2 / 3: Meter Power Live (230 V)
  • Pin 4–6: L1, L2, L3 Voltage inputs
  • Pin 13: RS485 B (-ve)
  • Pin 14: RS485 A (+ve)
  • Pin 15–20: CT inputs for L1, L2, L3 (white/black pairs)

Communication

  • RS485 A → Inverter TX+
  • RS485 B → Inverter TX-
  • Use twisted-pair cable such as Cat5/6.
  • Meters must be set to ID1 for 3-phase grid measurement.

Important Notes

  • Every 3-phase GivEnergy system requires one GEM630 (ID1).
  • A dedicated 6 A supply may be used to power the meter.
  • Incorrect CT orientation will cause reversed readings.
  • Do not mix CT clamps between phases.

    • Related Articles

    • EMS (Energy Management System) Manual

      Download Manual This article provides an installation, configuration, and operational summary for the GivEnergy EMS (Energy Management System) – GIV-EMS-V1. It condenses the official manual into a field-ready reference for installers working with ...
    • All in One & Giv-Gateway Manual

      This manual contains the installation, configuration, and safety information from the GivEnergy All in One & Giv-Gateway User Manual for models GIV-AIO-13.5, GIV-AIO-13.5-3.6 and GIV-AIO-GW1. It is intended as a quick reference for GivEnergy Approved ...
    • EV Charger Manual

      Download Manual This article provides an installation, configuration, and operation summary for the GivEnergy EV Charger (7.2 kW, V2). System Overview The GivEnergy EV Charger is a Type 2, 7.2 kW (32 A) AC charger designed for residential or ...
    • Stackable Batteries Manual

      This article summarises the Stackable Batteries Manual, which applies to the GivEnergy Stackable Battery System. This system consists of a base module with integrated electronics and stackable battery modules that can be added to increase storage ...
    • AC Coupled Inverter Installation Manual

      This manual summarises the installation manual for the GivEnergy AC Coupled Inverter. It applies to the AC 3.0 (UK) model and provides an overview of installation requirements, safety information, electrical connections, commissioning, and ...

    GivBot