Demand Response Management (Australia)

Demand Response Management (Australia)

When the inverter is used in Australia, it needs to connect to a DRMS (Demand Response Management System) device. Connect the DRMS device to the DRMS terminal of the inverter to run.

The RJ45 terminal is defined as follows:

Pin

DRMS

Pin

DRMS

Pin1 (Orange-White)

DRM1/5

Pin5 (Blue-White)

Ref/Gen

Pin2 (Orange)

DRM2/6

Pin6 (Green)

GND

Pin3 (Green-White)

DRM3/7

Pin7 (Brown-White)

/

Pin4 (Blue)

DRM4/8

Pin8 (Brown)

/

DRM Modes and Corresponding Pin Connections

Mode

RJ45 Pins to be Connected

Demand

DRM0

Connect Pin5 and Pin6

Stop

DRM1

Connect Pin1 and Pin5

Disallow charge

DRM2

Connect Pin2 and Pin5

Charge power should be less than 50% of the rated power

DRM3

Connect Pin3 and Pin5

Charge power should be less than 75% of the rated power

DRM4

Connect Pin4 and Pin5

Charge power should be less than 100% of the rated power

DRM5

Connect Pin1 and Pin5

Disallow discharge

DRM6

Connect Pin2 and Pin5

Discharge power should be less than 50% of the rated power

DRM7

Connect Pin3 and Pin5

Discharge power should be less than 75% of the rated power

DRM8

Connect Pin4 and Pin5

Discharge power should be less than 100% of the rated power

    • Related Articles

    • Enabling Demand Response Management

      To enable DRM control: Step 1: Log into the GivEnergy Monitoring Portal at www.givenergy.cloud Step 2: On your portal dashboard, hover over the ‘My Inverter’ card and select the expand icon. Step 3: In the ‘My Inverter’ screen, click the ‘Remote ...
    • Adjust Power Quality Response Mode Setpoints

      Power quality response mode includes: Volt-var response mode Volt-watt response mode Fixed power factor mode Reactive power mode Power rate limit mode The AIO supports all of these modes. Setting the Region setpoints Step 1: Log into the GivEnergy ...
    • Lights Guide

      Grid When energy is being imported from the grid, the arrows pointing towards the centre will be lit. When energy is being exported to the grid, the arrows pointing towards the grid will be lit. Battery When the battery is being charged, the arrows ...
    • Restarting the Dongle

      Navigate to Device Management. Select Restart Module. The message may say “Rebooting” indefinitely; allow up to 10 minutes for reconnection. If still offline after 10 minutes, refresh the page and retry.